Back
Reconstruction of Jõgeva biomass-fired boiler house
Client: AS Eraküte / Year of completion: 2013
In the framework of the Jõgeva boiler house project, a boiler house built during the Soviet time, which was heated with mazut and equipped with TKVR boilers, was renovated into a modern environmentally friendly, economical 6 MW biomass-fired boiler house.
As a result of the renovation work, the appearance of the boiler house became more appealing to the local population and the price of heat for the final consumer decreased by up to 25%.