Home
Back

Reconstruction of Jõgeva biomass-fired boiler house

Client: AS Eraküte / Year of completion: 2013

In the framework of the Jõgeva boiler house project, a boiler house built during the Soviet time, which was heated with mazut and equipped with TKVR boilers, was renovated into a modern environmentally friendly, economical 6 MW biomass-fired boiler house.

As a result of the renovation work, the appearance of the boiler house became more appealing to the local population and the price of heat for the final consumer decreased by up to 25%.

DSCF1360

DSCF1359

IMG_1706

DSCF1367

IMAG1015

IMAG0905

IMAG1062