Home
Back

Enefit-280 turbine building

Client: AS Eesti Energia Oil Plant / Year of completion: 2012

Technological equipment was installed and pipelines with the total length of 1850 metres were built in the Enefit-280 turbine building. The biggest was a DN1000 stainless steel pipe with the maximum hydrostatic test pressure of 152 Bar.

Enefit_3

Enefit_2

Enefit

IMG_0902

IMG_0905

IMG_0910