Back
Enefit-280 turbine building
Client: AS Eesti Energia Oil Plant / Year of completion: 2012
Technological equipment was installed and pipelines with the total length of 1850 metres were built in the Enefit-280 turbine building. The biggest was a DN1000 stainless steel pipe with the maximum hydrostatic test pressure of 152 Bar.