Reconstruction work of Marja boiler house in Tallinn
Client: Tallinna Küte AS / Year of completion: 2009
In the Marja boiler house the old mazut system was demolished. Instead, two modern liquid fuel tanks with the capacity of 2 x 2000 m3 were built. A pipeline and supports were built between the tank and boiler house.